Delivery exception report

Reconciles shipment, order, carrier, and customer-service records to identify late, failed, damaged, short, or misrouted deliveries with root-cause evidence and operational priorities. Use for logistics exception reporting, OTIF analysis, carrier review, or fulfillment problem management.

by adlass TemplatesVersion 1Uses adlass toolsUniversal

Published Aug 21, 2026 · Updated Aug 26, 2026

Helpful · 0View raw SKILL.md

Requirements

Add the process policy and field mapping for order_line, promised_date, delivered_at. Define thresholds, statuses, owners, and source precedence for ordered_qty, event_code, root_cause.

Skill document

The full SKILL.md your agent reads and follows.

Delivery exception report

Purpose

Reconcile promised delivery performance against actual shipment and receipt events, then explain the exceptions that require operational attention. Separate carrier delay from warehouse, inventory, address, customer, damage, and data-quality causes.

Scope

Assess order lines, promised date, pick and ship events, tracking milestones, proof of delivery, return records, damage claims, customer tickets, carrier service level, warehouse, SKU, quantity, and destination region. Calculate on-time-in-full and classify late, failed, short, damaged, lost, and misrouted deliveries.

Excluded: changing orders, filing claims, contacting carriers or customers, rerouting parcels, and inventing a delivery event.

Data basis

  • Order-line table: order_id, line_id, sku, ordered_qty, promised_date, ship_from.
  • Shipment and carrier events: tracking_id, shipped_at, delivered_at, event_code, carrier, service_level.
  • Receipt, return, damage, ticket, inventory, address, and warehouse records.
  • OTIF definition, cutoff timezone, tolerance, exception taxonomy, and severity policy.

Result

Produce a results sheet with one row per order line and an exception memo grouped by cause, carrier, warehouse, customer segment, and promised-date cohort.

Quality criteria

  • OTIF counts use the declared order-line denominator and exclude only documented cancellations.
  • Delivered timestamp, timezone, quantity, and proof-of-delivery status are cited for each outcome.
  • A late shipment is not labelled carrier-caused without a carrier event or agreed handoff timestamp.
  • Duplicate tracking IDs, partial shipments, split orders, and returns remain visible.
  • Exception totals reconcile to the assessed order-line population.

Instructions

Use promised date and the policy's timezone and grace window. Evaluate quantity and timing independently before assigning OTIF. For split shipments, mark the line complete only under the supplied consolidation rule. Prefer event chronology over free-text tickets, while retaining tickets as supporting evidence. Rank severity by customer impact, quantity affected, delay days, and policy thresholds. Label root causes confirmed or suspected.

Adapt before use

  • Map order, shipment, event, receipt, quantity, ticket, and warehouse columns.
  • Add the OTIF definition, time zone, grace period, cancellation rule, and severity matrix.
  • Define carrier handoff evidence and the required exception-owner vocabulary.

Related skills

  • 8D problem-solving report

    Builds a traceable 8D problem-solving report from a manufacturing complaint, defect record, and process evidence. Use for customer complaints, recurring production defects, containment records, corrective action reports, and structured root-cause investigations.

  • Capacity resource plan

    Converts demand forecasts, staffing calendars, work hours, absences, and throughput assumptions into a capacity plan with bottleneck dates and quantified staffing options. Use for workforce capacity planning, resource allocation, utilization review, and delivery-load analysis.

  • Construction punch list

    Converts inspection notes, photos, room data, and project requirements into a prioritized construction punch list with trade grouping and verification fields. Use for substantial completion, handover inspections, snagging, closeout walks, and defect follow-up.

  • Construction RFI draft

    Converts a construction field question or document conflict into a precise request for information with evidence, options, and schedule or cost implications. Use for RFIs, design clarifications, plan conflicts, specification gaps, and field coordination questions.