Back to library

Freight quote from RFQ

Turns a logistics request for quotation into a comparable freight calculation with route, equipment, accessorials, margin, validity, and explicit assumptions. Use for transport quotations, spot-rate responses, tender estimates, and shipment pricing preparation.

by adlass TemplatesVersion 1Uses adlass toolsUniversal

Published Aug 21, 2026 · Updated Aug 26, 2026

Helpful · 0View raw SKILL.md

Requirements

Add current rate tables, surcharge rules, and validity conventions. Define customer margin tiers and currency conversion rules. Specify which accessorials are included by default. Add approval thresholds for exceptional or low-margin quotes.

Skill document

The full SKILL.md your agent reads and follows.

Freight quote from RFQ

Purpose

Produce a defensible freight quote from the request and the company’s rate and margin rules.

Scope

Road, ocean, air, and multimodal freight requests where rates, surcharges, and customer terms are available in scope. Excluded: rate procurement, booking, carrier selection execution, and binding commercial approval.

Data basis

  • RFQ, lane and shipment details, rate table, surcharge list, customer terms, margin policy, and prior comparable quotes.
  • The fixed records, tables, or folders in the skill scope that hold the relevant history or schema.

Result

A quote draft, calculation sheet, and assumptions record that expose every included and excluded cost.

Quality criteria

  • Origin, destination, mode, equipment, cargo, timing, and trade terms are captured or marked missing.
  • Every rate and surcharge has a source and unit basis.
  • The calculation reconciles base rate, accessorials, margin, and total.
  • Validity and exclusions are explicit.
  • Unknown shipment details are assumptions or clarification points, never hidden.

Instructions

Match the request to the narrowest valid rate basis and do not mix currencies or units without documenting conversion. Separate pass-through charges from margin-bearing charges. Use the customer’s pricing rules before generic defaults. If multiple scenarios are plausible, show them separately and identify the decision variable. Preserve the rate version or effective date used.

Adapt before use

Keep the source trail close to every conclusion and preserve the difference between a source fact, a calculated value, an assumption, and a recommendation. Use stable identifiers across the document and sheet so a reviewer can move from a summary statement to the underlying row and source. Prefer a complete, transparent partial result over a confident answer built on missing evidence.

  • Add current rate tables, surcharge rules, and validity conventions.
  • Define customer margin tiers and currency conversion rules.
  • Specify which accessorials are included by default.
  • Add approval thresholds for exceptional or low-margin quotes.

Related skills

  • 8D problem-solving report

    Builds a traceable 8D problem-solving report from a manufacturing complaint, defect record, and process evidence. Use for customer complaints, recurring production defects, containment records, corrective action reports, and structured root-cause investigations.

  • Capacity resource plan

    Converts demand forecasts, staffing calendars, work hours, absences, and throughput assumptions into a capacity plan with bottleneck dates and quantified staffing options. Use for workforce capacity planning, resource allocation, utilization review, and delivery-load analysis.

  • Construction punch list

    Converts inspection notes, photos, room data, and project requirements into a prioritized construction punch list with trade grouping and verification fields. Use for substantial completion, handover inspections, snagging, closeout walks, and defect follow-up.

  • Construction RFI draft

    Converts a construction field question or document conflict into a precise request for information with evidence, options, and schedule or cost implications. Use for RFIs, design clarifications, plan conflicts, specification gaps, and field coordination questions.