Back to library

Property maintenance triage

Classifies property maintenance requests, checks responsibility and urgency against property records and lease terms, and prepares a work-order brief. Use for landlord operations, facilities requests, tenant repair cases, and maintenance queue review.

by adlass TemplatesVersion 1Uses adlass toolsUniversal

Published Aug 21, 2026 · Updated Aug 26, 2026

Helpful · 0View raw SKILL.md

Requirements

Add property, asset, lease, and vendor schemas. Define urgency classes, emergency indicators, and response targets. Set responsibility and cost-authority rules. Specify approved language for tenant communications.

Skill document

The full SKILL.md your agent reads and follows.

Property maintenance triage

Purpose

Turn an unstructured property issue into a correctly prioritized, contract-aware work-order record.

Scope

Maintenance requests for managed residential, commercial, and mixed-use properties. Excluded: dispatching contractors, emergency response, diagnosing unsafe conditions beyond the evidence, and approving spend.

Data basis

  • Request text, property and unit records, lease or service terms, asset history, vendor list, and maintenance policy.
  • The fixed records, tables, or folders in the skill scope that hold the relevant history or schema.

Result

A triage sheet, work-order brief, tenant-response draft, and escalation note where evidence requires it.

Quality criteria

  • Each case has property, location, issue type, urgency, and evidence status.
  • Responsibility is tied to a lease, service term, policy, or marked unknown.
  • Urgency classification uses the company rule and explains the trigger.
  • The work order contains scope, access information if available, and cost-limit context.
  • Emergency or safety indicators are escalated rather than minimized.

Instructions

Separate reported symptoms from confirmed causes. Use exact property and asset identifiers. Apply contract responsibility before assigning a vendor, and keep disputed responsibility visible. Do not promise a completion time not supported by the service policy or record. Treat safety, water ingress, fire, electrical, security, and habitability signals according to the configured escalation rules.

Adapt before use

Keep the source trail close to every conclusion and preserve the difference between a source fact, a calculated value, an assumption, and a recommendation. Use stable identifiers across the document and sheet so a reviewer can move from a summary statement to the underlying row and source. Prefer a complete, transparent partial result over a confident answer built on missing evidence.

  • Add property, asset, lease, and vendor schemas.
  • Define urgency classes, emergency indicators, and response targets.
  • Set responsibility and cost-authority rules.
  • Specify approved language for tenant communications.

Related skills

  • 8D problem-solving report

    Builds a traceable 8D problem-solving report from a manufacturing complaint, defect record, and process evidence. Use for customer complaints, recurring production defects, containment records, corrective action reports, and structured root-cause investigations.

  • Capacity resource plan

    Converts demand forecasts, staffing calendars, work hours, absences, and throughput assumptions into a capacity plan with bottleneck dates and quantified staffing options. Use for workforce capacity planning, resource allocation, utilization review, and delivery-load analysis.

  • Construction punch list

    Converts inspection notes, photos, room data, and project requirements into a prioritized construction punch list with trade grouping and verification fields. Use for substantial completion, handover inspections, snagging, closeout walks, and defect follow-up.

  • Construction RFI draft

    Converts a construction field question or document conflict into a precise request for information with evidence, options, and schedule or cost implications. Use for RFIs, design clarifications, plan conflicts, specification gaps, and field coordination questions.