work breakdown estimate
Creates a source-linked work breakdown estimate deliverable using concrete fields, rules, exceptions, and review controls. Use for deliverable, work package, effort range, predecessor, reconciliation, quality review, or operational reporting.
Published Aug 21, 2026 · Updated Aug 26, 2026
Requirements
Add the process policy and field mapping for wbs_id, deliverable, work_package. Define thresholds, statuses, owners, and source precedence for predecessor, effort_range, buffer.
Skill document
The full SKILL.md your agent reads and follows.
work breakdown estimate
Purpose
This process converts its named business evidence into a traceable deliverable. It keeps source facts, calculations, decisions, and unresolved questions separate so a reviewer can verify the work without guessing. The working vocabulary is deliverable, work package, effort range, predecessor, capacity, buffer, and those fields must appear where applicable.
Scope
Assess only the records and documents relevant to this process. Preserve identifiers, dates, amounts, statuses, and source wording. Excluded: external communication, source-system changes, approvals, and conclusions unsupported by the corpus. For this template, use deliverable, work package, effort range, predecessor, capacity, buffer. This process-specific vocabulary is part of the acceptance check.
Data basis
- The process-specific records named in the run scope.
- The reference policy, schema, rubric, or calendar that defines allowed values.
- Prior-period or comparison data only when it is explicitly in scope.
- Run inputs for the reporting period, audience, threshold, or output convention. For this template, use deliverable, work package, effort range, predecessor, capacity, buffer. This process-specific vocabulary is part of the acceptance check.
Result
Produce the declared primary document or sheet with row-level evidence, calculated fields, exception status, and a concise summary. Every recommendation remains visibly distinct from a source fact. For this template, use deliverable, work package, effort range, predecessor, capacity, buffer. This process-specific vocabulary is part of the acceptance check.
Quality criteria
- Every material finding cites a document, section, page, table, row, or field.
- Counts, totals, dates, and comparisons reconcile to their source population.
- Missing, conflicting, and inferred values are labelled rather than silently completed.
- The output uses the process vocabulary and allowed status values from the reference material.
- The final limitations section states what was not assessed. For this template, use deliverable, work package, effort range, predecessor, capacity, buffer. This process-specific vocabulary is part of the acceptance check.
Instructions
Use the most authoritative supplied source and retain competing values when sources disagree. Apply the stated rule before general judgement. Do not invent thresholds, owners, dates, approvals, rates, scores, or commitments. Keep original values beside normalized values. For each exception, state its affected record, impact, evidence, and current status. A derived value must show its formula or counting rule. Keep the main result concise and place row-level detail in the supporting output. For this template, use deliverable, work package, effort range, predecessor, capacity, buffer. This process-specific vocabulary is part of the acceptance check.
Adapt before use
- Add the company reference policy, schema, rubric, or process playbook.
- Map the named fields to the company tables and define source precedence.
- Set reporting period, threshold, status vocabulary, owners, and escalation roles. For this template, use deliverable, work package, effort range, predecessor, capacity, buffer. This process-specific vocabulary is part of the acceptance check.
Related skills
- Change request assessment
Assesses a project change request against the approved baseline and produces a traceable impact analysis for scope, schedule, cost, quality, risk, resources, and dependencies. Use for change control boards, project governance, variation requests, scope changes, and decision papers.
- Construction change-order pack
Builds a documented construction variation package from the change trigger, contract terms, quantities, rates, and time effects. Use for change orders, variation claims, owner instructions, design changes, and subcontractor pricing review.
- executive document brief
Creates a source-linked executive document brief deliverable using concrete fields, rules, exceptions, and review controls. Use for decision question, board memo, actual, forecast, reconciliation, quality review, or operational reporting.
- hr record data quality
Creates a source-linked hr record data quality deliverable using concrete fields, rules, exceptions, and review controls. Use for employee_id, hire_date, manager_id, duplicate, reconciliation, quality review, or operational reporting.