Zurück zur Bibliothek

Inventory reorder proposal

Turns item demand, on-hand stock, open purchase orders, supplier lead times, and service-level rules into a cited reorder proposal with quantity, timing, stockout risk, and assumptions. Use for replenishment planning, inventory control, purchasing recommendations, and warehouse exception reviews.

von adlass TemplatesVersion 1Nutzt adlass-ToolsUniversell

Veröffentlicht 21. Aug. 2026 · Aktualisiert 26. Aug. 2026

Hilfreich · 0Rohes SKILL.md ansehen

Voraussetzungen

Add replenishment policy with service target and demand window. Map SKU, location, stock, demand, PO, supplier, and unit fields. Define usable inbound statuses and overdue-PO treatment. Set planning horizon and proposal-cost currency.

Skill-Dokument

Das vollständige SKILL.md, das dein Agent liest und befolgt.

Inventory reorder proposal

Purpose

Calculate replenishment proposals from demand history and current supply while exposing the lead-time, safety-stock, and service-level assumptions behind each recommendation.

Scope

Cover inventory master, stock ledger, demand history, open purchase orders, supplier lead-time table, minimum order quantities, safety-stock policy, and warehouse calendar. Excluded: placing purchase orders, changing stock counts, supplier negotiation, and guaranteeing availability.

Data basis

  • Inventory fields sku, location, on_hand, allocated, available, reorder_point, safety_stock, and unit_cost.
  • Demand fields date, sku, location, quantity, and status.
  • Purchase orders with po_id, ordered_qty, due_date, and status.
  • Supplier lead time, MOQ, pack-size, and replenishment policy.

Result

Produce a reorder sheet with net available, demand rate, projected stockout date, suggested quantity, order-by date, MOQ adjustment, cost, confidence, and source citations.

The proposal is a decision workpaper rather than a purchase order: each quantity is accompanied by its calculation inputs, inbound assumption, and confidence level. Items blocked by missing parameters remain visible with a reason and no invented quantity.

Quality criteria

  • Exclude cancelled demand and distinguish allocated from available units.
  • Include open POs only when status and due date make them usable.
  • Apply stated demand window, lead time, safety stock, MOQ, and order-cycle rules.
  • Flag negative stock, missing lead time, stale demand, and conflicting units.
  • Cite inventory, demand, PO, supplier, or policy rows for every proposal.

Instructions

Calculate net available as on-hand minus allocated plus usable inbound. An overdue PO is not received without a receipt row. Use the policy demand window and service target; never invent a safety factor. Round proposed quantity up to MOQ or pack multiple and show unrounded need. Separate data-gap risk from demand-driven stockout risk.

Adapt before use

  • Add replenishment policy with service target and demand window.
  • Map SKU, location, stock, demand, PO, supplier, and unit fields.
  • Define usable inbound statuses and overdue-PO treatment.
  • Set planning horizon and proposal-cost currency.

Verwandte Skills

  • 8D problem-solving report

    Builds a traceable 8D problem-solving report from a manufacturing complaint, defect record, and process evidence. Use for customer complaints, recurring production defects, containment records, corrective action reports, and structured root-cause investigations.

  • Capacity resource plan

    Converts demand forecasts, staffing calendars, work hours, absences, and throughput assumptions into a capacity plan with bottleneck dates and quantified staffing options. Use for workforce capacity planning, resource allocation, utilization review, and delivery-load analysis.

  • Construction punch list

    Converts inspection notes, photos, room data, and project requirements into a prioritized construction punch list with trade grouping and verification fields. Use for substantial completion, handover inspections, snagging, closeout walks, and defect follow-up.

  • Construction RFI draft

    Converts a construction field question or document conflict into a precise request for information with evidence, options, and schedule or cost implications. Use for RFIs, design clarifications, plan conflicts, specification gaps, and field coordination questions.