RFQ award comparison

Compares supplier offers on a normalized RFQ scope, total evaluated cost, weighted criteria, exceptions, and delivery risk, then produces a documented award recommendation and clarification list. Use for sourcing events and bid evaluations.

von adlass TemplatesVersion 1Nutzt adlass-ToolsUniversell

Veröffentlicht 21. Aug. 2026 · Aktualisiert 26. Aug. 2026

Hilfreich · 0Rohes SKILL.md ansehen

Voraussetzungen

Map RFQ lines, offer lines, currencies, quantities, delivery, warranty, and exceptions. Add weights, disqualifiers, cost model, currency rule, and clarification statuses. Define award authority, validity-date treatment, and optional or recurring charge handling.

Skill-Dokument

Das vollständige SKILL.md, das dein Agent liest und befolgt.

RFQ award comparison

Purpose

Create a like-for-like supplier comparison that shows scope coverage, evaluated cost, weighted quality, delivery risk, exceptions, and the evidence behind a proposed award.

Scope

Review RFQ, statement of requirements, supplier offers, pricing schedules, incoterms or delivery terms, implementation plans, supplier questionnaire, evaluation rubric, and clarification log.

Excluded: contacting suppliers, negotiating offers, approving an award, creating a purchase order, and inventing missing bid values.

Data basis

  • RFQ line items with quantity, unit, specification, required date, and mandatory flag.
  • Supplier offer tables with line price, currency, lead time, minimum order, validity, warranty, and exceptions.
  • Evaluation rubric, cost model, supplier records, and clarification history.

Result

A comparison sheet with normalized line coverage, evaluated total cost, score by criterion, risk, exception, rank, and citation, plus an award memo and clarification queue.

Quality criteria

  • Mandatory requirements and quantities are tested for every supplier.
  • Cost arithmetic identifies currency, freight, discounts, recurring charges, and assumptions.
  • Weighted scores reproduce the rubric and do not award points for missing evidence.
  • Every recommendation and finding cites an RFQ, offer, rubric, or clarification row.

Instructions

Normalize units and line references without hiding supplier wording. Separate one-time, recurring, freight, tax, optional, and excluded costs. Apply the evaluation rubric and disqualifying rules before ranking. A missing mandatory response is not a zero-quality score unless the rubric says so. Keep supplier-specific assumptions visible and compare only the same requirement version.

Do not compare supplier totals across currencies without the approved conversion rule and rate date. Record whether a warranty, implementation service, or freight component is included in each bid. A lower price cannot override a mandatory non-compliance finding.

Adapt before use

  • Map RFQ lines, offer lines, currencies, quantities, delivery, warranty, and exception fields.
  • Add evaluation weights, disqualifiers, cost model, currency rule, and clarification status values.
  • Define award authority, validity-date treatment, and handling of optional or recurring charges.

Verwandte Skills

  • 8D problem-solving report

    Builds a traceable 8D problem-solving report from a manufacturing complaint, defect record, and process evidence. Use for customer complaints, recurring production defects, containment records, corrective action reports, and structured root-cause investigations.

  • Capacity resource plan

    Converts demand forecasts, staffing calendars, work hours, absences, and throughput assumptions into a capacity plan with bottleneck dates and quantified staffing options. Use for workforce capacity planning, resource allocation, utilization review, and delivery-load analysis.

  • Construction punch list

    Converts inspection notes, photos, room data, and project requirements into a prioritized construction punch list with trade grouping and verification fields. Use for substantial completion, handover inspections, snagging, closeout walks, and defect follow-up.

  • Construction RFI draft

    Converts a construction field question or document conflict into a precise request for information with evidence, options, and schedule or cost implications. Use for RFIs, design clarifications, plan conflicts, specification gaps, and field coordination questions.